
Add to Cart
Discription:
Molded gearing requires special attention in the areas of unique part and cavity design, precision molding, and inspection. Rarely do molded gears have the cosmetic appearance requirements of other plastic parts, but they are often required to transfer relatively large torques or precise rotary position in less than perfect environmental conditions.
Processing:
1. Start from part design analysis.
2. Mold design drawing and DFM report available so you can see how is the mold going to be before mold making.
3. If product is complex, moldflow report will be present as well.
4. Indoor workshop ensures you high quality under good control.
5. Normally it takes several days to make mold, precise time depends on complexity of design.
Specification:
Keywords | Plastic parts of cars | Size | Customized size |
Usage | Electrical / Automatic industry | Mould type | Prototype / series mould |
Cavity | Single / multi cavity | Runner | Cold / hot runner system |
Delivery | Wooden case packing | Certification | ISO |
Our Expertise:
1. Precision fabrication to AGMA 10 standards
2. High or low volume requirements
3. Specialized molding dies
4. Value added features, including one-part molding
5. Material selection using highly engineered resins
6. Insert molded gears
Why Choose Us?
· Many years Experience
· Advantaced Machine,Professional Printing technology
· Competitive Price
· Excellent,reliable and personalized service
· Struct and Superior Quality Control Under Under ISO Certificates
· In-time delivery
· Factory visit anytime
FAQ:
1. Are you a trading company or a manufacturer?
We are a manufacturer as you can see our workshop as above
2. What kind of trade terms can you do?
EX-WORKS,FOB,CIF,DDP DDU
3. What is your terms of payment?
50% Mold cost deposit,balance mold cost +50% production cost paid when samples confimed,Balance production cost paid against copy of B/L. We accept T/T
4. Do you support OEM ?
Yes, we can produce by technical drawings or samples.
5. How about your delivery time?
Generally, it take 40 days ( 30 days do mold and 10 days do mass production).